Post 5 Lift Station Improvements

Project Overview


Upgrading municipal water infrastructure to include a 300,000 gallon underground storage system

  • Phase II Engineering
  • Lift Station
  • Permitting
  • Mechanical/Electrical Engineering
  • Construction Observation
  • Electric Service Coordination

The Village of Tinley Park engaged CBBEL to design and construct the rehabilitation of its Post 5 Lift Station, which had reached the end of its service life and needed replacement. The project included installation of a 300,000-gallon cast-in-place concrete underground storage system, a 500 kW diesel engine standby generator, two 280 HP pumps and a control building with an automatic transfer switch, main circuit breaker and motor control center. The project also required the decommissioning and demolition of the existing control building and site restoration. 

Project Photos

Now you’ve seen this project, check out all the services we offer.

Want to see more? With 13 distinct departments, the CBBEL team’s expansive list of specializations provides a depth of expertise that promotes project success.

Get In Touch today

Let’s Work Together

Have a question? A project? Want to apply for an internship or learn more about our work?