After a Dam Safety Inspection revealed a poor rating, Kokomo Waterworks Reservoir No. 2 Dam was improved to be in compliant with IDNR requirements. Design documents were prepared that included raising the south half of the concrete ogee spillway to match the existing crest elevation of the north half, removing and repairing unsound concrete with shotcrete, and adding additional revetment riprap to the upstream slope and areas adjacent to the concrete abutments.

 

The Details

Location

Kokomo, Indiana

Construction Cost/Fee

$723 thousand

Client

Indiana-American Water Company, Inc.