Addison Creek Reservoir

Project Overview


Working with the MWRD to reduce flooding in communities along Addison Creek.

  • Flood Protection Analysis
  • Shop Drawing Review
  • Stormwater Improvements
  • Survey

CBBEL worked with the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) for more than five years on the Addison Creek Reservoir, a flood control project designed to benefit the communities along Addison Creek. The 600-acre-foot reservoir is located in Bellwood and holds almost 200 million gallons of stormwater. The project included installation of two 87.5-inch steel pipes bored under the railroad tracks between the creek and the reservoir, as well as a concrete spillway to dissipate the energy of incoming floodwaters.

The CBBEL team also assisted the MWRDGC during construction of the reservoir, including on-site environmental services, field surveying services and review of shop drawings and submittals.

Project Photos

Now you’ve seen this project, check out all the services we offer.

Want to see more? With 13 distinct departments, the CBBEL team’s expansive list of specializations provides a depth of expertise that promotes project success.

Get In Touch today

Let’s Work Together

Have a question? A project? Want to apply for an internship or learn more about our work?