IL Route 7 Improvement

Project Overview


Enhancing safety, mobility and accessibility for motorists and pedestrians, while implementing important infrastructure upgrades

  • Phase I Engineering
  • Phase II Engineering
  • Traffic Analysis
  • Drainage Improvements
  • Agency Coordination
  • Public Involvement

CBBEL is helping the City of Lockport improve a section of IL Route 7 that runs through the city. Route 7 was generally one lane in each direction, so to make safety and traffic flow improvements, alternatives were developed to widen the roadway to provide a continuous bi-directional center turn lane with improvements to the storm sewer and curb and gutter.

CBBEL has completed a Phase I Engineering study, which included traffic analysis, topographic survey, environmental analysis, a local drainage study and proposed improvement plans.

Project Photos

Now you’ve seen this project, check out all the services we offer.

Want to see more? With more than a dozen distinct departments, the CBBEL team’s expansive list of specializations provides a depth of expertise that promotes project success.

Get In Touch today

Let’s Work Together

Have a question? A project? Want to apply for an internship or learn more about our work?