Back to News

Rehabilitation of A Steel Wet Well

December 16th, 2020

Lombard (Cambria Lift Station Rehab 180140.00000)WEB

Cambria Lift Station Rehabilitation was recently featured in WaterWorld magazine. Phase 2 of the Cambria Lift Station Rehabilitation was performed under two contracts with Christopher B. Burke Engineering Ltd. as the design consultant.  Click HERE to read the full article.