CBBEL designed a $2.5 million new inter-zone booster pumping station and 4,300’ of transmission main. The pump station building was designed and constructed to blend in with the adjacent property by providing the building with an exterior facade similar in architecture to the adjacent school.

The Details

Location

Lombard, Illinois

Construction Cost/Fee

$1.2 million (booster station) $1.3 million (transmission main) / $280 thousand

Client

Village of Lombard

Projects